Clapham Apartment Block
This large development was designed by a ‘tier 1’ consultancy and good friends of ours. Our contribution was to redesign the foundations eliminating the piles; the substructure used about the same volume of concrete and quantity of reinforcement, but with less excavation. The objective had been to rescue the program; a side benefit was a huge cost saving.